|
We ship via the most cost effective method. Brazilian decking is very
heavy. For example, 1x6 decking weighs 4.4 lbs per square foot.
To move such heavy items we must take care in who we allow to move our
decking.
If anything unexpected happens, call Advanced Building
Supplies immediately. If your shipment is damaged or short, note
it on the delivery receipt or bill of lading before signing and call ABS!
Detailed answers are as follows.
LTL or Less than a Truck Load
Smaller shipments in the one to two ton range are usually shipped
via a freight company. |
|
|
|
Hot Shot or Small Flatbed Trailer
| With larger shipments the price of LTL gets
too high and short range flatbed trailer becomes both more
economical. The small flatbed trailer has a variety
of advantages including |
| |
- more control over delivery date and time,
- direct delivery from our warehouse to your home,
- easy access to neighborhoods and gated communities |
| |
|
Large Shipments
|
| |
Greater than 20 tons we ship via a large
flatbed truck (not shown) |
|
 |
|
 |
|
|
Small Items
Small Items or accessories and samples are sometimes shipped
separately via USPS or UPS Ground |
 |
|
Will the delivery person unload my shipment for me?
No! The delivery driver will not assist you in
unloading your shipment. All residential deliveries are curbside.
You must have at least two people at the delivery location to unload your
shipment.
What should I do when the shipment arrives?
Check the following when the
shipment arrives:
- Strapped shipments, Verify the
number of bundles and that they are intact
- Check for damages
- Verify the count of all materials
- Note any discrepancies or damages on the delivery receipt or bill of
lading
- Sign the receipt
Is everything here? Check the packing slip. Verify the presence
of all materials. We frequently send smaller accessories via UPS or
USPS. However, some smaller materials may be packaged together
within the crate. If the quantity is less than on your packing
list, make a note on the delivery receipt or bill of lading to ensure
proper compensation and correction of the order.
Sign the receipt. Once you have completed the inspection of the
delivery and verified that no materials are damaged or missing, or you
have noted any discrepancy or damage, you may sign the receipt.
Photos: If possible, take photos of the damage.
Freight claims take months to resolve and involve many layers of
management in the Freight Company. Photos of the damage can help win a
case. (Yes, we know this from personal experience)
If the damages are not noted at
the time of the delivery, Advanced Building Supplies is not responsible
for compensation and is unable to file a claim with the Freight Company.
In such cases you will be responsible for filing a claim with the
Freight company.
Missing Materials: If you find that something missing from the
shipment, please make appropriate notes on the delivery receipt. Then
call Advanced Building Supplies Immediately.
If your crates are unopened and items are missing call Advanced
Building Supplies immediately. We photograph your order before the
final crating and it is easy for us to verify any discrepancies from
those photos.
Replacements and Damages:
In cases where there is no obvious damages on the outside of the
packaging. If you accept the shipment and sign for no damages or
shortages, later discovering that there indeed are damages or shortages
hidden from view, you must contact the delivering company within 48
hours of delivery to report it. Advanced Building Supplies cannot file
any claims on your behalf after 7 days.
|